Our Projects
Home » Projects
Eton Range Realignment Project
Shotcreting provided for the Eton Range Realignment Project to upgrade the safety of the highway.
North Goonyella concrete pour sets two new Australian records as the longest concrete pour (1040m) and the longest distance that steel fibre concrete has been pumped (360m) to resurface the underground concrete roadway.
BMA Broadmeadow Mine
1000+ metres of pipeline loaded for one of our long distance pumping projects at BMA Broadmeadow Mine.
Bowen Boat Ramp
Boat ramp repair underwater with our 49m boom and scuba divers at Bowen Boat Ramp.
Eungella Range 30m Underwater
Eungella Dam Repair pumping 220m³ of concrete, through 146m of pipeline, 30m below water level.
Koumala & Sarina Range Cyclone Repair
Robotic Shotcrete 25m³/Hour at Aurizon site on Cyclone Debbie remediation.
Kestrel North Mine Closure
6000m³ batched and pumped on site for the Kestrel North mine closure.
★★★★★ 5/5
We had extension on our house, Troy was able to pump the concrete over
the top of the house through to the back without any hassle. Which saved
us a lot of time and money.
Jack
Client